Click here to make tpub.com your Home Page

Page Title: VAN BODY REMOVAL - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-391-10
PREPARATION FOR INTERNAL AIR TRANSPORT,
0052 00
HIGHWAY, OR RAIL SHIPMENT Continued
VAN BODY REMOVAL - Continued
12. Install washer (7), bolt (4), and washer (6) in subframe (8) with slotted nut (5).
13. Install lynch pin (3) in bolt (4).
14. Perform steps (12) and (13) on opposite side of subframe.
VAN BODY INSTALLATION
1. Remove lynch pin (3) from bolt (4).
2. Remove slotted nut (5), washer (6), bolt (4), and washer (7) from subframe (8).
3. Perform steps (1) and (2) on opposite side of subframe.
0052 00-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business