Click here to make tpub.com your Home Page

Page Title: FUEL INJECTOR TIMING MAINTENANCE - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-2
0322 00
FUEL INJECTOR TIMING MAINTENANCE (Contd)
WARNING
Diesel fuel is flammable. Do not perform fuel system procedures
near open flame. Injury to personnel may result.
NOTE
Timing refers to when the fuel is injected into the cylinder. In
order for the engine to run efficiently, the fuel must be injected a
set number of crankshaft degrees before top center (TC).
Always perform injector timing when an injector has been
removed and reinstalled or replaced.
LOCATING TOP CENTER POSITION FOR NO. 1 PISTON
1.
Remove plug (4) and O-ring (3) from timing hole (2) on flexplate housing (1). Discard O-ring (3).
2.
Install timing bolt in timing hole (2) on flexplate housing (1).
NOTE
When turning crankshaft, use the four large screws on front of
crankshaft. Do not use the eight small screws on front of
crankshaft pulley.
If rocker arm assemblies have been removed and installed prior to
setting fuel timing, rotate crankshaft two complete revolutions to
allow rocker arms to properly seat on injectors.
3.
Turn crankshaft clockwise until timing bolt engages non-threaded hole in flywheel.
ADJUSTMENT
1.
Clean holding fixture and set block with lint-free cloth.
2.
Press top ball on pivot arm of holding fixture fully and hold.
3.
Position holding fixture on set block with side edge of set block against stabilizing blade, top edge of
set block against indicator contact point, and inside bottom edge of set block against base of holding
fixture.
4.
Release top ball on pivot arm of holding fixture.
5.
Set double zero on the vertical dial indicator.
a. Loosen red thumb screw on rear of holding fixture and slide vertical dial indicator vertically
until small needle lines up on zero. Tighten red thumb screw.
b. Loosen bezel screw on vertical dial indicator and turn bezel until large needle lines up on zero.
Tighten bezel screw.
6.
Remove set block from holding fixture.
0322 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business