Click here to make tpub.com your Home Page

Page Title: POWER PLANT REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-24-1-2
0295 00
POWER PLANT REPLACEMENT (Contd)
101.
Install tube assembly (1) on turbocharger (5) and charged air cooler (4) with clamps (2) and (3).
102.
Install exhaust flex elbow (10) and new gaskets (6) and (7) on turbocharger (5) and inlet on exhaust
pipe (8) with two clamps (9).
103.
Install hose (23) to elbow (22) on radiator (21).
104.
Install elbows (12) and (13) on intake manifold (20) with hose clamps (11) and (14).
105.
Install air inlet hoses (24) and (28) with elbow (26) on turbocharger (5) and air cleaner elbow (29)
with clamps (25) and (27).
106.
Install hose (16) on air compressor (30) and adapter tube (17) with two clamps (19).
107.
Install air intake tube assembly (15) on charged air cooler (4) with clamp (18).
108.
Install brushguard (WP 0230 00).
109.
Install
quick-start
cylinder and valve (vehicles built before serial No. 504924) (WP 0055 00).
110.
Install
quick-start
cylinder and valve (vehicles built after serial No. 504923) (WP 0059 00).
111.
Install
quick-start
tubes (vehicles built before serial No. 504924) (WP 0056 00).
112.
Install
quick-start
tubes (vehicles built after serial No. 504923) (WP 0060 00).
2
1
3
9
10
9
~
6
5
8
7
~
4
0295 00-40

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business