Quantcast POWER PLANT REPLACEMENT - continued - TM-9-2320-386-24-1-20057

 

Click here to make tpub.com your Home Page

Page Title: POWER PLANT REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
POWER PLANT REPLACEMENT - continued - TM-9-2320-386-24-1-20056
Up
/.5ton/TM-9-2320-386-24-1-2 Extended Service Program (ESP) for 2-1/2-Ton 6x6 M44A3 Series Trucks (Diesel) Manual
Next
POWER PLANT REPLACEMENT - continued - TM-9-2320-386-24-1-20058
TM 9-2320-386-24-1-2
0295 00
POWER PLANT REPLACEMENT (Contd)
73.
Remove eight screws (3) and propeller shaft (2) from flanges (1) and (4) on transmission (6) and
transfer case (5).
74.
Loosen nut (18) and remove vent tube (17) from elbow (19) on transmission (6).
75.
Disconnect plug with leads 429 and 428 (21) from magnetic speed sensor lead (20) on flywheel housing (14).
NOTE
Perform step 76 for vehicles with serial numbers up to 504923 only.
76.
Remove four screws (9), lockwashers (10), ground strap (16), lockwasher (15), and quick-start
bracket (11) from engine (13). Discard lockwashers (10) and (15).
77.
Remove locknut (22), clamp (8), and engine wiring harness (7) from stud (12) on engine (13). Discard
locknut (22).
3
2
1
~
4
6
5
0295 00-16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business