Click here to make tpub.com your Home Page

Page Title: ENGINE COOLANT HEATER FUEL TUBE AND PREHEATER RESISTOR REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-2
FIELD MAINTENANCE INSTRUCTIONS
FOR SPECIAL PURPOSE KITS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
ENGINE COOLANT HEATER FUEL TUBE AND PREHEATER RESISTOR REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Materials/Parts
Applicable Models
Nut-assembled lockwasher
All
(item 247, WP 0470 00)
Tools And Special Tools
Screw-assembled lockwasher
(item 261, WP 0470 00)
General mechanic's tool kit
Sleeve (item 433, WP 0470 00)
(item 116, WP 0470 00)
Electrical tool kit (item 114, WP 0470 00)
Equipment Condition
Multimeter (item 51, WP 0470 00)
Parking brake set and wheels chocked
(TM 9-2320-361-10).
Battery ground cable disconnected
(WP 0126 00).
Engine coolant heater overheat switch and
igniter removed (WP 0422 00).
0423 00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business