Click here to make tpub.com your Home Page

Page Title: DELIVERY PUMP STRAINER REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-2
FIELD MAINTENANCE INSTRUCTIONS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
DELIVERY PUMP STRAINER REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
Applicable Models
Equipment Condition
M49A2C, M50A3
Parking brake set and wheels chocked
(TM 9-2320-361-10).
Materials/Parts
Battery ground cable disconnected
(WP 0126 00).
Four lockwashers (item 232, WP 0470 00)
Gasket (item 78, WP 0470 00)
WARNING
Diesel fuel is flammable. Do not perform fuel system procedures
near open flames. Injury or death to personnel may result.
REMOVAL
Remove four screws (1), lockwashers (2), cover (6), gasket (5), and strainer (4) from strainer body (3).
Discard lockwashers (2) and gasket (5).
INSTALLATION
1.
Install strainer (4), new gasket (5) and cover (6) on strainer body (3) with four new lockwashers (2)
and screws (1).
2.
Connect battery ground cable (WP 0126 00).
3.
Release parking brake and remove wheel chocks (TM 9-2320-361-10).
2
3
1
5
4
6
END OF WORK PACKAGE
0284 00-1/2 blank

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business