Click here to make tpub.com your Home Page

Page Title: TRANSFER CASE CONTROLS AND LINKAGE MAINTENANCE (W/PTO) - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-1
0133 00
TRANSFER CASE CONTROLS AND LINKAGE MAINTENANCE (W/PTO) (Contd)
INSTALLATION
1.
Install PTO shift control lock (5) and spring (6) to PTO shift control handle (4) with screw (7) and
new locknut (8). Ensure PTO shift control lock (5) turns freely on PTO shift control handle (4).
2.
Install two lubrication fittings (2) on two mounting brackets (1) and install mounting brackets (1)
on PTO shift control shaft (11).
3.
Install new woodruff key (12) and lever (15) on PTO shift control shaft (11) with screw (16) and
new locknut (14).
4.
Install seal (13) on cab floor (9).
NOTE
Assistant will help with step 5.
5.
Install two mounting brackets (1) with PTO shift control shaft (4) on cab floor (9) with four
screws (3) and new locknuts (10).
3
16
2
15
3
2
4
1
5
14
6
1
11
12
7
13
8
10
9
0133 00-5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business