Click here to make tpub.com your Home Page

Page Title: TRANSMISSION INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-1
FIELD MAINTENANCE INSTRUCTIONS
2-1/2 TON, 6X6, M44A2 SERIES TRUCKS (MULTIFUEL)
TRANSMISSION INSTALLATION
INITIAL SETUP:
Applicable Models
Personnel Required
All
Two
Tools and Special Tools
References
General mechanic's tool kit
(item 1, WP 0469 00)
Equipment Condition
Sling, engine and transmission
(item 91, WP 0469 00)
Parking brake set and wheels chocked
Breaker bar, 1/2-in. drive
(TM 9-2320-361-10).
(item 6, WP 0469 00)
Battery ground cable disconnected
Torque wrench, 1/2-in. drive
(item 136, WP 0469 00)
Cab top removed
Lifting device
(if overhead lifting device is used)
Two utility chains
(TM 9-2320-361-10).
Transmission gearshift lever removed
Materials/Parts
Twelve screw-assembled lockwashers
Cab tunnels removed (WP 0230 00).
Power takeoff propeller shaft removed
(item 252, WP 0470 00)
(vehicles w/PTO installed) (WP 0346 00).
Four screw-assembled lockwashers
Transfer case to transmission propeller shaft
(item 254, WP 0470 00)
Four screws (item 321, WP 0470 00)
Intermediate propeller shaft removed
Four washers (item 374, WP 0470 00)
Two locknuts (item 129, WP 0470 00)
Gasket (item 73, WP 0470 00)
Lockwasher (item 192, WP 0470 00)
0132 00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business