Click here to make tpub.com your Home Page

Page Title: ENGINE REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-1
0046 00
ENGINE REPLACEMENT (Contd)
INSTALLATION (Contd)
28.
Connect wire (41) to accessory wire (42).
NOTE
Ensure terminals are clean before connections are made.
29.
Install positive wire (38) on alternator (40) with new lockwasher (33) and nut (34). Tighten
nut (34) 4555 lb-in (56 Nm).
30.
Install ground wire (32) on alternator (40) with new lockwasher (30) and screw (31). Tighten
screw (31) 82102 lb-in (912 Nm).
31.
Install spacer (26) on alternator (40) and wire retaining strap (27) on terminal (39) with two new
lockwashers (28) and screws (29). Tighten screws (29) 3035 lb-in (34 Nm).
32.
Seal terminal (39) and terminal cover (35) completely with adhesive sealant.
33.
Install terminal cover (35) on alternator (40) with two new lockwashers (36) and screws (37).
37
36
35
29
31
28
34
33
30
27
38
32
26
39
42
40
41
38
42
41
EARLY MODELS
32
0046 00-17

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business