Click here to make tpub.com your Home Page

Page Title: Table 1. Preventive Maintenance Checks and Services (PMCS) - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-1
0023 00
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) (Contd)
Table 1. Preventive Maintenance Checks and Services (PMCS) (Contd).
ITEM
ITEM TO CHECK/
EQUIPMENT NOT
INTERVAL
PROCEDURE
NO.
SERVICE
READY/AVAILABLE IF:
CAUTION
Exhaust bypass system will overheat tank
body if there is less than 10 in.
(25.0 cm) of water in either compartment.
Make sure level is above 10 in. (25 cm)
before checking exhaust bypass system.
Check exhaust bypass system for proper
41
Semiannually Exhaust
Exhaust bypass
operation as follows:
bypass system
system is
malfunctioning.
WARNING
Do not touch hot exhaust system
components with bare hands. Injury to
personnel may result.
a. Close and latch front exhaust shutoff
valve (1).
b. Open rear exhaust shutoff valve (2).
c. Start engine (TM 9-2320-361-10).
d. Check to make sure exhaust gases are
coming out of rear exhaust.
e. Stop engine (TM 9-2320-361-10).
f. Open front exhaust shutoff valve (1).
g. Close rear exhaust shutoff valve (2).
1
2
0023 00-20

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business