Click here to make tpub.com your Home Page

Page Title: Table 2. STE/ICE-R Go Chain Test - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-361-24-1
0017 00
SIMPLIFIED TEST EQUIPMENT FOR INTERNAL COMBUSTION ENGINE--REPROGRAMMABLE
(STE/ICE-R) GO CHAIN TROUBLESHOOTING (Contd)
Table 2. STE/ICE-R Go Chain Test (Contd).
NOTE
Test GO1, VTM Connections and Checkout, must be
performed before running any other STE/ICE-R test.
TK
GOVERNOR CHECK/POWER TEST
G07
MODE
CAUTION
Governor operation must be checked before
performing power test to avoid possible engine
damage.
1
CHECK GOVERNOR OPERATION
Watch the VTM display.
Increase engine speed to maximum governor
speed shown below.
MAXIMUM
GOVERNOR SPEED
2850 RPM
Press further on accelerator to full throttle.
Does engine RPM remain below maximum
at full throttle?
YES
NO
Is engine RPM greater than upper limit?
Proceed to step 2.
Adjust throttle control linkage
YES
2
NO
Engine RPM is below lower limit.
Proceed to Governor/Power Test
Fault Isolation, Test NG 90
NG90

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business