Click here to make tpub.com your Home Page

Page Title: Chapter 18. WINCH, HOIST, AND POWER TAKEOFF ASSEMBLIES GROUP MAINTENANCE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-3
WINCH, HOIST, AND POWER
TAKEOFF ASSEMBLIES GROUP MAINTENANCE
Section I. SCOPE
18-1. EQUIPMENT ITEMS COVERED. This chapter gives equipment maintenance
procedures for the winch and hoist assemblies, and power takeoff assembly for which
there are authorized corrective maintenance tasks at the direct and general support
maintenance levels.
18-2. EQUIPMENT ITEMS NOT COVERED. All equipment items for which corrective
maintenance is authorized at the direct and general support maintenance levels are
covered in this chapter.
Section II. WINCH AND HOIST ASSEMBLIES
18-3. FRONT WINCH REPAIR.
TOOLS:
No special tools required
Solvent, dry cleaning, type II (SD-2), Fed. Spec P-D-680
SUPPLIES:
Clean rags
Gearcase cover gasket
Bearing cap gasket
Sliding clutch key (2)
Brake case gasket
Preformed packing
Brake case cover gasket
PERSONNEL:
TW O
EQUIPMENT
CONDITION: Truck parked, engine off, handbrake set.
Preliminary Procedures.
a.
Refer to TM 9-2320-209-20.
(1) Remove front winch.
(2) Drain front winch.
Refer to LO 9-2320-209-12/1.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business