Click here to make tpub.com your Home Page

Page Title: END GATE CONTROL LINKAGE REMOVAL, REPAIR, AND REPLACEMENT (TRUCK M342A2) - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-2
FRAME 3
Join chain slings to dump body (1) as shown. Join chain slings to hoist. Raise dump
1.
body and position safety braces. Refer to TM 9-2320-209-20.
2.
Aline holes in crosshead roller arms (2) with holes for lift pins (3) under dump
body (1).
Drive in two lift pins (3). Put in two lubrication fittings (4).
3.
Put in two screws (5) and nuts (6).
4.
Raise dump body (1) to take weight off safety braces (7). Lower safety braces.
5.
Using hoist, lower dump body (1). Take away hoist and chain slings.
6.
NOTE
Follow-on Maintenance Action Required:
1.
Replace taillights and stoplights. Refer to
TM 9-2320-209-20.
2.
Replace tailgate.  Refer to para 17-66.
3.
Adjust tailgate linkage. Refer to para 17-68h.
END OF TASK
17-830

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business