Click here to make tpub.com your Home Page

Page Title: END GATE CONTROL LINKAGE REMOVAL, REPAIR, AND REPLACEMENT (TRUCK M342A2) - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-2
FRAME 9
1.
Put pioneer bracket (1) in place on dump body (2) and put in four screws
and nuts (3).
2.
Using hoist, put cab shield lower half (4) in place.
3.
Put in four screws (5) and nuts (6).
Soldier A 4.
Put in three screws (7).
Soldier B 5. Working inside dump body (2), put on three nuts (8).
GO TO FRAME 10
17-825

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business