Click here to make tpub.com your Home Page

Page Title: FLOOR BOARDS REMOVAL, REPAIR, AND REPLACEMENT (TRUCK M756A2) - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-34-2-2
e.
Replacement.
FRAME 1
Put in 13 floorboards (1).
Soldiers 1.
A and B
Put in 12 hold down slats (2) and two parts of hold down slat (3).
2.
Put in 84 carriage bolts (4).
Soldier A 3.
NOTE
Washers (5) and nuts (6) may have been replaced
with locknuts.
Working under truck, put on 84 washers (5) and nuts (6).
Soldier B 4.
NOTE
Follow-on Maintenance Action Required:
1.
Replace A-frame assemblies. Refer to
TM 9-2320-209-10.
Replace tailgate and troop seat rack assemblies.
2.
Referto TM 9-2320-209-10.
Replace front and rear end curtains. Refer to
3.
Bow and Tarp Kits Installation and Removal,
TM 9-2320-209-10.
Replace body tarpaulin. Refer to Bow and Tarp
4.
Kits Installation and Removal, TM 9-2320-209-10.
END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business