Click here to make tpub.com your Home Page

Page Title: WINCH AND POWER TAKEOFF SPROCKETS REMOVAL, REPAIR, AND REPLACEMENT (TRUCK M756A2).
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-3-4
19-8. WINCH AND POWER TAKEOFF SPROCKETS REMOVAL, REPAIR, AND RE-
PLACEMENT (TRUCK M756A2).
3/4-inch drive ratchet
TOOLS:
Short extension
1 1/2-inch socket
Medium ballpeen hammer
1/4-inch punch
Needle nose pliers
Snapring pliers
6-inch puller
5-foot prybar
Wood block, 2 x 4 x 15 1/2 inches
Wood block, 2 x 4 x 3 inches
SUPPLIES: Solvent, dry cleaning, type II (SD-2), Fed. Spec P-D-680
Cotter pin
PERSONNEL:
Two
Truck parked, engine off, handbrake set.
EQUIPMENT
CONDITION:
Preliminary Procedure.  Remove winch drive chain.  Refer to para 19-13.
a.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business