Quantcast LOW AIR PRESSURE BUZZER SWITCH REMOVAL AND REPLACEMENT - continued - TM-9-2320-209-20-3-10706

 

Click here to make tpub.com your Home Page

Page Title: LOW AIR PRESSURE BUZZER SWITCH REMOVAL AND REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
LOW AIR PRESSURE BUZZER SWITCH REMOVAL AND REPLACEMENT - continued - TM-9-2320-209-20-3-10705
Up
/.5ton/TM-9-2320-209-20-3-1 2-1/2-Ton 6x6 M44A1 and M44A2 Series Trucks (Multifuel) Truck Cargo: M35A1 M35A2 M35A2C M36A2 Manual
Next
Chapter 8. TRANSMISSION SYSTEM GROUP MAINTENANCE - TM-9-2320-209-20-3-10707
TM 9-2320-209-20-3-1
d.
Type B Replacement.
FRAME 1
Using 13/16-inch open end wrench, screw in and tighten low air pressure
1.
switch (1) into tube and hose manifold (2).
NOTE
Check tags put on plugs (3) so that plugs are put back in
right place.
2.
Put two electrical plugs (3) into receptacles on switch (1). Take off tags.
NOTE
Follow-on Maintenance Action Required:
Start engine and check operation of low air pressure
buzzer.  Refer to TM 9-2320-209-10.
END OF TASK

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.