Quantcast STARTER PEDAL AND LINKAGE ASSEMBLY REMOVAL, REPAIR, AND REPLACEMENT - continued - TM-9-2320-209-20-3-10467

 

Click here to make tpub.com your Home Page

Page Title: STARTER PEDAL AND LINKAGE ASSEMBLY REMOVAL, REPAIR, AND REPLACEMENT - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
STARTER PEDAL AND LINKAGE ASSEMBLY REMOVAL, REPAIR, AND REPLACEMENT
Up
/.5ton/TM-9-2320-209-20-3-1 2-1/2-Ton 6x6 M44A1 and M44A2 Series Trucks (Multifuel) Truck Cargo: M35A1 M35A2 M35A2C M36A2 Manual
Next
STARTER PEDAL AND LINKAGE ASSEMBLY REMOVAL, REPAIR, AND REPLACEMENT - continued - TM-9-2320-209-20-3-10468
TM 9-2320-209-20-3-1
c.  Repair.  Repair starter pedal and linkage by straightening, welding, or
replacing any bent or damaged parts. Refer to FM 43-2 or TM 9-237.
Replacement.
d.
FRAME 1
Soldier A
1.
Put starter pedal (1) on floor of cab and aline four mounting holes
as shown.
2.
Put four bolts (2) through mounting holes. Hold bolts down with
fingers and tell soldier B to put on mounting plate (3).
Put mounting plate (3) on four bolts (2) and screw on four
Soldier B
3.
locknuts (4) finger tight.  Tell soldier A which bolt to hold with
wrench when ready to tighten locknuts.
Using 7/16-inch wrench, hold each of four bolts (2).
Soldier A
4.
Using 7/16-inch wrench, tighten each of four locknuts (4).
Soldier B
5.
GO TO FRAME 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.