Quantcast COOLING SYSTEM SERVICE - continued - TM-9-2320-209-20-3-10414

 

Click here to make tpub.com your Home Page

Page Title: COOLING SYSTEM SERVICE - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
COOLING SYSTEM SERVICE - continued - TM-9-2320-209-20-3-10413
Up
/.5ton/TM-9-2320-209-20-3-1 2-1/2-Ton 6x6 M44A1 and M44A2 Series Trucks (Multifuel) Truck Cargo: M35A1 M35A2 M35A2C M36A2 Manual
Next
COOLING SYSTEM SERVICE - continued - TM-9-2320-209-20-3-10415
TM 9-2320-209-20-3-1
d. Flushing.
Using screwdriver, loosen two screws (1) on two clamps (2). Spread both
1.
clamps and take clamps off preformed hose (3).
2.
Using 9/16-inch wrenches, unscrew and take off nut (4) from bolt (5). Pull
bolt out of rod end clevis (6).
Pull top of radiator (7) forward just enough to take off preformed hose (3).
3.
GO TO FRAME 2
TA 086802

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.