Click here to make tpub.com your Home Page

Page Title: Table 1-8. Organizational Preventive Maintenance Checks and Services Semiannual Schedule for M756A2 Pipeline Construction Tru...
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-209-20-1
Table 1-8. Organizational Preventive Maintenance Checks and Services Semiannual Schedule
for M756A2 Pipeline Construction Truck - Cont
Item
Procedures
Item
To Be
Check for and Have Repaired,
No.
Inspected
Replaced, Adjusted as Necessary
2
(d) When drag brake is properly adjusted,
(cont)
unwind rest of cable (1). Refer to
TM 9-2320-209-10.
4. Check that cable (1) is not kinked, does not
have broken wires, or broken/loose clamps.
5. Check that drum (2) is not cracked, and does
not have broken welds.
6. Wind cable back on drum. Refer to
TM 9-2320-209-10.
7. Check adjustment of winch automatic brake.
Automatic brak e should hold a 1,000 pound
load without slipping. Refer to Vol 3,
chapter 19, para 19-3 for test and adjust-
ment procedures.
1-48

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business