|
|
TM 9-2320-209-20-1
Table 1-4. Organizational Preventive Maintenance Checks and Services Semiannual Schedule
for M50A1, M50A2, and M50A3 Water Tank Trucks
Item
Procedures
Item
To Be
Check for and Have Repaired,
No.
Inspected
Replaced, Adjusted as Necessary
1
Nozzle, coupling,
1. Open both rear compartment doors (1).
cap, and hoses
2. Check that dispenser nozzle (2), Y coupling
(3), gate valve caps (4), and hoses (5) are not
missing or damaged.
2
Water pump
NOTE
system and
gravity discharge
Refer to TM 9-2320-209-10 for operating pro-
system
cedures when doing the following checks.
1-29
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |